Professional Manufacturer of Desanders and Separator. One Stop Solutions of Mud and Sludge Handling Systems.


In the construction of diaphragm wall at a construction site in Hangzhou, the volume of each diaphragm groove section is 400m3.

product Overview:

In the construction of diaphragm wall at a construction site in Hangzhou, the volume of each diaphragm groove section is 400m³.


  • Commodity name: In the construction of diaphragm wall at a construction site in Hangzhou, the volume of each diaphragm groove section is 400m3.

Category:

You can send us an email:design@cesite.cn

Inquire Now
+
  • undefined

Product Details

In the construction of diaphragm wall at a construction site in Hangzhou, the volume of each diaphragm groove section is 400m³. In the early stage of the project, it took the client 6 hours on average to clean a groove with the traditional desander to met the concrete piling requirements. Instead, after using our RMT150-100, the average time for cleaning a groove was 2.5 hours, which greatly reducing the time from groove forming to piling process, and improving the construction efficiency.

S-RMT150-100in Hangzhou

S-RMT500-100in Guangzhou Site

GXA400mud separator in Haikou project

GXA400Aseparator in waste water treatment project

GXA400chamber separator in Danyang project

RMT500/60 in Hangzhou site

RMT500/60in Singapore

RMT250 for Metro line project

CONTACT US

Tel: 0516-87892770 / 87892771 Contact phone: 13805211750 Company fax: 0516-87892771 Customer service telephone number: 4006-365-002

Xuzhou Guerian Environmental Protection Equipment Co., Ltd.

Xuzhou Greenan environmental equipment Co.Ltd.

ONLINE MESSAGES

图片名称

Piling Worker Lu Ying Society

图片名称

Mobile phone

图片名称

WeChat

CONTACT US

Company address:No 21, Yangshan Rd, Gulou District, Xuzhou, China.

Tel: 13805212029

Tele/What's app:+86-13805212029

Email:cira77@greenanep.com 

Business License

Copyright © 2023 Xuzhou Greenan environmental equipment Co.Ltd.

Poweredby:www.300.cn nanjing| SEO