S-RMT500 Mud Sand Removal and Purification Equipment

product Overview:

RMT500 is a mud purification device combined with 2-RMT250 and RPS500. It is suitable for mud purification and recovery of large pile foundation projects, cut-off wall projects, and mud-water balance method shield construction using mud wall protection and circular drilling technology. It is an essential equipment for foundation construction to reduce construction costs and improve construction efficiency.


  • Commodity name: S-RMT500 Mud Sand Removal and Purification Equipment

You can send us an email:mandy@greenanep.com

Inquire Now
+
  • undefined

Product Details

Applies to:

RMT500 is a mud purification device combined with 2-RMT250 and RPS500. It is suitable for mud purification and recovery of large pile foundation projects, cut-off wall projects, and mud-water balance method shield construction using mud wall protection and circular drilling technology. It is an essential equipment for foundation construction to reduce construction costs and improve construction efficiency.

Main advantages:

Fully purify the mud, effectively control the performance index of the mud, reduce stuck pipe accidents, and improve the quality of hole making.

Realize the recycling of mud and save mud making materials. Significantly reduce the cost of waste pulp transportation and pulping costs.

The effective separation of soil and slag by the equipment is conducive to improving the efficiency of pore making.

The closed loop purification method of mud and the lower moisture content of slag reduce the impact on the environment.

Using double-layer screens, the purification effect is nearly 50% higher than that of single-layer screens. It is safe and convenient to operate, simple to maintain, and stable and reliable to operate.

The main parameters:

Max capacity ( m3/h)

500 

Cut point (mm)

d50=0.06

Total power (kw)

120.4kw

Main pump motor power (kw)

55x2

Vibration motor power (kw)

2.2x2+1.5x4

Largest dimension (L×W×H)(m)

7.7×5.2×4.3

Total weight (kg)

15000

 

  Construction Cases:

  

1

 

  

1

 

  Subway construction site at Xiancun Road, Zhujiang New Town, Tianhe District, Guangzhou

  

1

 

  RMT500 simple version sand removal system case of Shishou Yangtze River Bridge

CONTACT US

Email: mandy@greenanep.com

 Tele/What's app: +86-13805212029

Related Products

Welcome your message consultation

Submit

Xuzhou Greenan environmental equipment Co.Ltd.

ONLINE MESSAGES

Piling Worker Lu Ying Society

Piling Worker Lu Ying Society

Mobile phone

Mobile phone

WeChat

WeChat

CONTACT US

Company address:No 21, Yangshan Rd, Gulou District, Xuzhou, China.

Tel: 13805212029

Tele/What's app:+86-13805212029

Email:cira77@greenanep.com

Copyright © 2023 Xuzhou Greenan environmental equipment Co.Ltd.